ACCEPTED MATERIALS
Dirt, Rock, Soil, Sand
Must be free of organics and contaminants
Concrete
Fully cured, washout, and concrete block/pavers
Asphalt
Broken pavement, RAP, grindings
Brick, Clay, and Clay Products
Includes clay pipe and roofing tile
Plaster & Stucco
Plaster/Stucco with or without reinforcing wire
Drilling mud
Call for requirements
DIRECTIONS
TRUCK TYPE | PRICE |
---|---|
Pick Up / Single Axle Trailer | $40.00 |
Stakebed / Flatbed / Two-Axle Trailer | $50.00 |
Bobtail | $50.00 |
10-Wheel / Roll-Off | $90.00 |
Super 10 / Strong Arm | $110.00 |
Semi / End Dump /Truck & Pup | $140.00 |
Truck & Transfer / Bottom Dump | $160.00 |
Fee Schedule for Loads with Oversized 2'x2'+, Reinforced Concrete and Excessive Rebar
TRUCK TYPE | PRICE |
---|---|
Bobtail | $200.00 |
10 Wheel / Super 10 / Strong Arm | $250.00 |
End Dump / Truck & Transfer | $300.00 |
Large Jobs May Qualify for Reduced Pricing - Call for Details
Materials not Listed are not acceptable and Must not be Brought onto Premises
Cameras and Video Recordings in Use to Ensure Compliance
UNACCEPTABLE MATERIAL
(NO REFUNDS FOR RELOADS):
NO GREEN WASTE, WOOD, GRASS, HAZARDOUS / CONTAMINATED MATERIALS, DRYWALL, TRASH, LIQUIDS, ASBESTOS MATERIALS